-
from KGS 1 mln
or equivalent in USD
-
KGS
from 17*%
-
USD
from 10*%
-
-
Up to KGS 36 000 000 or equivalent in USD
-
To 60 months
-
Purposes: Energy saving (replacement of current equipment with more energy-efficient equipment (consuming less energy/electricity) at the enterprise
-
Water purification, water use, water conservation, etc.
-
Renewable energy production
-
Insulation/thermal insulation of business premises: workshops, hotels, factories, etc. (replacement of windows, insulation of walls, roofs and other insulation measures)
-
Resource saving
-
* The Bank’s authorized body shall reserve the right to change the established tariffs on interest rates
-
Effective interest rate: USD from 11.2%, KGS from 17,5%

Loan Application
Other products
News
-
Non-working day in USA
Please take into account that July 04, 2025 - is non-working day in USA.
Value date for payments in USD – July 07, 2025. -
Visa and KICB sponsored the fashion show “Fashion and Art”
The “Fashion and Art” fashion show took place at the Abdylas Maldybaev Kyrgyz National Academic Opera and Ballet Theatre in Bishkek, organized by the public foundation “Forum Kurak”. The event was supported by the international payment system VISA and KICB as general partners.
-
We work without a lunch break!
In order to improve the availability of banking services and enhance service quality, starting from July 1, 2025, the Bank has introduced a new work schedule with no lunch break.
The new schedule applies to the following KICB branches: